KEEP PERFECT KNIT3D KNITTED BAGS BY QUANZHOU JUNYUAN BAGS Get a quote

How to Brief a Knitted Bag Programme: A Twelve-Item Checklist and the Seven Numbers Behind It

A knitted bag brief has to answer three questions before it answers any others: what is the bag for, what market does it ship to, and who can approve a sample. Twelve checklist items follow, and seven of them are numbers rather than descriptions — gauge, GSM, yarn count, colourway count, quantity per colourway, in-market date and approval authority. A brief with those seven can be quoted in about two working days. This article sets the checklist out in the order a programme reads it.

One page knitted bag brief document on a desk beside a laptop showing sections for purpose, market, quantity and timing
A one-page brief: commercial facts first, so the technical questions that follow are the ones that actually matter.

What a Brief Has to Answer That a Tech Pack Does Not

A brief answers the commercial questions and a tech pack answers the technical ones; the brief states purpose, market, quantity, timing and approval authority, none of which belong on a drawing and all of which change the price.

Conflating the two documents is the most common cause of a slow quotation. A tech pack sent in place of a brief contains everything needed to make the bag and nothing needed to price it: no quantity, so the volume band is unknown; no market, so the compliance target is unknown; no in-market date, so the freight mode is unknown; no named approver, so every decision is a round trip. Those four are commercial facts and they sit in the brief. The programme then needs both documents, but it needs the brief first, because the brief determines which technical questions are worth asking.

There is a second and subtler reason to separate them. A brief is a document a buying team can circulate internally and get signed off; a tech pack is not. Commercial facts — how many, by when, to where, at what price — are decisions a merchandiser and a finance function make. Technical facts are decisions a designer makes. Putting both in one document means the document has to route through both functions before anything can happen, which is the mechanism by which a two-day quotation becomes a two-week one.

Checklist Items One to Three: Purpose, Volume, Market

The first three checklist items are purpose, annual volume and destination market, and all three change the specification rather than merely describing it: purpose sets the load case, volume sets the band, and market sets the compliance target.

Purpose should be stated as a use case rather than as a category. Promotional handout, retail core range, gift-with-purchase threshold, corporate gifting and e-commerce own-range each produce a different bag at the same nominal description, and the differences are in GSM, trim count and compliance rather than in silhouette. Annual volume should be stated as a range across twelve months rather than as a first order, because the band a programme can plan yarn against is the annual figure. Market should be named by country or by bloc, since REACH, Prop 65, CPSIA and GRS apply differently and a compliance screen chosen for the wrong market is a wasted screen.

  • Purpose: the use case, stated in one line, since it sets GSM, trim count and the compliance screen.
  • Annual volume: a range across twelve months, not the first order alone, because yarn is planned annually.
  • Destination market: named by country or bloc, so the right substance screen is selected the first time.
  • Channel: retail, e-commerce, corporate or promotional, since each carries a different packing requirement.
  • Price target: a landed figure per unit, which lets the programme propose a specification that reaches it.

Checklist Items Four to Six: Gauge, GSM, Yarn Count

Items four to six are the first of the seven numbers: gauge as E7, E12 or E14; finished GSM as a figure with a plus or minus 5% tolerance; and yarn count as 150D, 300D, 450D or 600D with the fibre named.

These three are the numbers that decide whether a quotation is comparable. Two quotations for the same photograph can differ by a fifth purely on GSM, because GSM drives material consumption and cycle time together. A brief that states gauge and yarn count but not GSM is the most common near-miss: the programme has two of the three and will assume the third, and the assumption will be the value that suits the default rather than the value the buyer pictured. The coherence check is worth doing on the brief itself: 320 g/m² at E12 in 300D is coherent; 320 g/m² at E14 in 600D is not, because the loops will not close.

Where a buyer genuinely does not know these three, the honest move is to say so and to give the constraint instead: a price target, a required carry life, or a hand described by reference to an existing bag. A constraint is usable; an absent field is not, because it gets filled with a default. A brief that says 320 g/m² or whatever reaches USD 4.80 landed is more useful than one that leaves GSM blank.

Checklist Items Seven to Nine: Colourways, Trim, Compliance

Items seven to nine are colourway count, the trim set and the compliance target, and of the three the one most often under-specified is the trim set, because it is usually described by name rather than by specification.

Colourway count is a number with a direct cost consequence: MOQ is 100 pcs per style and per colourway, so four colourways is a fourfold commitment against one, and each colourway is a separate yarn set-up on the bed. The trim set should be listed with a specification per line rather than named — a #5 coil zip at 45 cm with the tape dyed to the body shade is auditable, while a black zip is not. The compliance target should name the standard and the market: REACH Annex XVII, California Prop 65, CPSIA, GRS or OEKO-TEX STANDARD 100, each of which is a different screen with a different cost.

1. Gauge
E7, E12 or E14, as a number rather than a description
2. Finished GSM
A figure with plus or minus 5% tolerance
3. Yarn count and fibre
150D, 300D, 450D or 600D; polyester, rPET or nylon
4. Colourway count
A number, since MOQ applies per colourway
5. Quantity per colourway
100 pcs minimum, stated per style and per colourway
6. In-market date
A date, which sets freight mode and the backwards schedule
7. Approval authority
A named person who can sign off a sample without escalation
Four yarn cones in different shades arranged on a shelf with labels showing colourway names and yarn count
Four colourways, four yarn set-ups. The colourway count is a cost line on the brief, not a styling detail.

Checklist Items Ten to Twelve: Quantity, Timing, Approval Authority

The last three items are quantity per colourway, the in-market date and the named approver, and the third is the one that most often decides whether a programme runs in 8 weeks or in 12.

Quantity per colourway is straightforward and is stated per style and per colourway at 100 pcs minimum. The in-market date is the one that drives the schedule: it determines whether freight runs 21 days by sea or about 5 days by air, and therefore whether the backwards schedule starts 12 weeks or 9 weeks out. Approval authority is the one nobody writes down and everybody feels. A programme with a named approver who can say yes at a fit assessment without escalating will run the sampling window; a programme where every sample has to go to a committee will add three days per gate, and across five gates that is the difference between 8 weeks and close to 12.

The Three Questions a Brief Must Answer in the First Paragraph

Three questions belong in the first paragraph of any knitted bag brief — what is the bag for, which market does it ship to, and who can approve a sample — because everything downstream depends on them and none of them can be inferred from a drawing.

The first-paragraph discipline is worth adopting literally. Most briefs open with a description of the product, which is the part the programme least needs early, and bury the commercial facts on the third page or omit them entirely. Opening with the three questions means a reader who stops after one paragraph still knows enough to decide whether the programme is feasible, which is the decision that matters first. The rest of the brief is then read by someone who has already decided to proceed, and it is read more carefully as a result.

Twelve checklist items, in the order a programme reads them

  • 1. Purpose: the use case in one line, which sets GSM and trim count.
  • 2. Annual volume: a range across twelve months, not the first order.
  • 3. Destination market: named, so the substance screen is right first time.
  • 4. Gauge: E7, E12 or E14 as a number.
  • 5. Finished GSM: a figure with plus or minus 5%.
  • 6. Yarn count and fibre: 150D to 600D, polyester, rPET or nylon.
  • 7. Colourway count: a number, since MOQ applies per colourway.
  • 8. Trim set: a numbered list with a specification on every line.
  • 9. Compliance target: the standard and the market, named together.
  • 10. Quantity per colourway: 100 pcs minimum per style.
  • 11. In-market date: which sets freight mode and the backwards schedule.
  • 12. Approval authority: one named person who can sign off a sample.

What Belongs in the Brief and What Belongs in the Tech Pack

The split is simple once stated: commercial facts go in the brief, construction facts go in the tech pack, and the two documents share only one field — the quantity, which appears in both because it belongs to both.

In practice the confusion is almost always in one direction: technical detail arrives in the brief and commercial detail does not arrive at all. A programme does not mind having too much technical information early, but it cannot quote without the commercial facts, and the absence of those is what stalls a quotation. The remedy for a buyer is to write the brief first and the pack second, in that order, even if the pack already exists. Writing the brief forces the commercial questions to be answered, and they are the ones that are usually still open.

Ten items assigned to the brief or the tech pack, with the reason each sits where it does.
ItemBrief or tech packWhy it sits there
Purpose and use caseBriefSets GSM and trim count, neither of which is a drawing decision
Annual volumeBriefYarn is planned across twelve months, not per order
Destination marketBriefSelects the substance screen, which is chosen once per programme
Quantity per colourwayBothCommercial commitment and production set-up at the same time
In-market dateBriefSets freight mode and therefore the backwards schedule
Approval authorityBriefDetermines decision latency, the largest hidden calendar cost
Gauge, GSM, yarn countTech packConstruction facts, needed once the programme is feasible
Stitch structure and reinforcementTech packProgramming inputs, irrelevant until the programme proceeds
Trim list and hardware finishTech packAuditable specification, checked at the pre-production sample
Compliance standardBothSelected from the market in the brief, executed in the pack

Brief Formats: What Actually Gets Read

A brief of one page with twelve numbered items gets read and answered; a deck of eighteen slides with the same information gets skimmed, because the twelve items the programme needs are buried among the thirty-six it does not.

Length is not the issue; findability is. A long brief is fine if the twelve items are numbered and in the first two pages, and a short brief is useless if the quantity is mentioned only in a sentence about the launch plan. The format that works is an email with twelve numbered lines and a separate attachment for imagery, rather than a document in which imagery and specification alternate. The reason is practical: the twelve lines can be answered in a reply, whereas a deck has to be reconstructed into an answer, and reconstruction is where items get dropped.

Email on a screen with twelve numbered lines listing brief items against a knitted bag programme with a separate image attachment
Twelve numbered lines in an email, with imagery as a separate attachment. The brief can then be answered in a reply rather than reconstructed.

The Seven Numbers Without Which No Brief Can Be Quoted

Seven numbers decide whether a brief can be quoted: gauge, GSM, yarn count, colourway count, quantity per colourway, in-market date and the number of people who have to approve a sample — and the last of the seven is the one most briefs leave out.

Six of the seven are self-explanatory and the seventh deserves a note. The number of approvers is a number with a calendar consequence: each additional approver adds decision latency at each gate, and across five gates each additional day of latency costs five days of calendar. A brief that names one approver is not merely tidier; it is measurably faster, and it is faster in the part of the schedule where nobody is tracking the cause. Where a brand cannot name a single approver, the next best thing is to name one and to state a maximum response time for the others.

What Happens After the Brief Is Sent

A complete brief produces a feasibility note in about two working days, a quotation against the stated specification, and a proposed backwards schedule from the in-market date — and the three together are what a buyer should expect back rather than a price alone.

A price alone is a warning sign. It usually means the programme has filled the absent fields with defaults, and the defaults will be overturned by the first clarification, which is how a quoted figure becomes a different confirmed figure. A feasibility note states whether the shape works at the stated gauge and GSM; a quotation prices the stated specification; a backwards schedule shows what has to happen by when. All three are inexpensive to produce from a complete brief and all three are unreliable from an incomplete one.

01

Complete brief

Twelve items, seven of them numbers. Feasibility note in about two working days, quotation that holds within about 3%, and a backwards schedule.

Quote in two days
02

Partial brief

Seven fields: silhouette, dimensions, gauge, GSM, yarn, colour, quantity. Enough for feasibility, not for a fixed price.

One question round
03

Imagery-only brief

A mood board with no numbers. Four defaults get applied and the first sample will not match the drawing.

Two question rounds
04

Brief with no approver named

Technically complete and practically slow. Adds about three days per gate, which across five gates is most of a month.

Adds four weeks

Sending a Brief That Gets a Usable Answer

The practical test of a brief is whether it can be answered in a reply, and a twelve-item brief with seven numbers can be — which is the difference between a quotation in two working days and a question round that costs a week.

From that answer the programme runs its standard windows: 7 working days of sampling and 30 days of bulk production from the approved handover, released against AQL 2.5 under an ISO 2859-1 sampling plan. MOQ is 100 pcs per style and per colourway, FOB Xiamen is the standard term with CIF and DDP available, and the reference unit cost for a standard E12 tote at specification is USD 4.80. Capacity behind the brief is 7 production lines running about 200,000 pcs per month, which is why the constraint on most programmes is the brief itself rather than the floor.

Send a brief that can be answered

Use the twelve items and the seven numbers. Our knit team will return a feasibility note in about two working days, a quotation against your stated specification, and a backwards schedule from your in-market date. Start on the contact page.

Frequently Asked Questions

What is the difference between a knitted bag brief and a tech pack?

A brief carries the commercial facts — purpose, market, quantity, timing, approval authority — and a tech pack carries the construction facts. Only quantity appears in both, because it is a commercial commitment and a production set-up at the same time.

Why should the brief be written before the tech pack?

Because writing the brief forces the commercial questions to be answered, and those are the ones usually still open. A tech pack sent in place of a brief contains everything needed to make the bag and nothing needed to price it.

What three questions should open a knitted bag brief?

What is the bag for, which market does it ship to, and who can approve a sample. None of the three can be inferred from a drawing, and a reader who stops after one paragraph should still be able to judge feasibility.

Which seven numbers does a brief need to be quotable?

Gauge, finished GSM, yarn count, colourway count, quantity per colourway, in-market date and the number of people who must approve a sample. The last is the one most briefs omit and the one with the largest calendar effect.

Why do two quotations for the same bag differ by a fifth?

Usually GSM. A brief that states gauge and yarn count but not GSM leaves the programme to assume the third, and GSM drives material consumption and cycle time together, which is where most of the price difference sits.

What should a buyer do if they do not know the GSM?

Give the constraint instead: a price target, a required carry life, or a hand described by reference to an existing bag. A constraint is usable, whereas a blank field is filled with a default that may not match the drawing.

How does colourway count affect the brief?

Directly, because MOQ is 100 pcs per style and per colourway and each colourway is a separate yarn set-up. Four colourways is a fourfold commitment against one, and it is a cost line on the brief rather than a styling detail.

How should the trim set be stated in a brief?

As a numbered list with a specification on every line. A #5 coil zip at 45 cm with the tape dyed to the body shade is auditable; a black zip is not, and any gauge or finish will satisfy it.

Why does the number of approvers matter?

Because each additional approver adds decision latency at each gate. Across five gates, one extra day of latency costs five days of calendar, which is the largest untracked cost in most knit programmes.

What format should a knitted bag brief take?

An email with twelve numbered lines and imagery as a separate attachment. The twelve lines can be answered in a reply, whereas a deck has to be reconstructed into an answer, and reconstruction is where items get dropped.

How long should a brief be?

Length matters less than findability. A long brief is fine if the twelve items are numbered and in the first two pages; a short brief is useless if the quantity appears only in a sentence about the launch plan.

What should come back after a complete brief is sent?

Three things: a feasibility note in about two working days, a quotation against the stated specification, and a backwards schedule from the in-market date. A price alone usually means absent fields were filled with defaults.

How does the in-market date change the programme?

It sets the freight mode, which sets the backwards schedule: about 12 weeks out for sea freight at roughly 21 days, or about 9 weeks out for air at roughly 5 days, with the sampling and production blocks fixed either way.

Is capacity ever the constraint on a knit programme?

Rarely. Seven production lines running about 200,000 pcs per month handle most programmes comfortably. The binding constraint is usually the brief: an unanswered commercial question, or an approval chain that adds days at every gate.

People Also Ask

What should I include in a knitted bag brief?

Twelve items: purpose, annual volume, market, gauge, GSM, yarn count, colourway count, trim set, compliance target, quantity per colourway, in-market date and a named approver. Seven of the twelve are numbers.

How quickly can a knit programme quote from a brief?

About two working days for a complete brief with all seven numbers. A partial brief triggers a question round, and each round costs roughly a week before the quotation can be issued.

Do I need a tech pack to get a quote?

Not for a feasibility note, which needs about seven fields. A fixed price needs the full fourteen-field pack, because without GSM and stitch structure the programme works from defaults that a later clarification will overturn.

Why does my knit quotation keep changing?

Because an absent field was filled with a default. Gauge defaults to E12, structure to plain jersey and GSM to whatever the yarn count produces, and each is overturned when the real number arrives.

Who should be named as the sample approver?

One person who can say yes at a fit assessment without escalating. If a brand cannot name a single approver, name one and state a maximum response time for everyone else.

Sources and further reading

Every figure on this page is either our own programme data or attributed below. Open the originals before you write them into a specification.

A Brief Is a Set of Decisions, Not a Description

The best briefs read like a list of decisions already taken: this many, in this market, by this date, approved by this person, at this gauge and this GSM. The worst read like a description of a product and leave the decisions to be taken later, by someone who does not have the commercial context to take them well.

For the document that follows the brief, see knitted bag tech pack template. For the volume commitment behind checklist item ten, see knitted bag MOQ explained, and for the programme windows a brief opens, see custom knit bags.