Knitted Bag Programme Handover: Eleven Items Between an Approved Sample and a Running Bed

What has to pass from sampling to bulk on a knitted bag programme? Eleven items, and the three that most often go missing are the setting parameters, the yarn lot reference and the packing count. A handover without them produces a bulk run that looks right and measures wrong. This article lists the eleven with what each one prevents, walks the 30-day plan they unlock, and gives the shortened five-item version used for a repeat run.

Approved knitted bag sample on a table beside a printed production specification folder and a tape measure
The approved sample is the evidence; the eleven handover items are the argument that makes that evidence apply to the run.

What Handover Is Actually For

Handover is the point at which an approved sample becomes a production specification, and it is complete when eleven items have been written down — because a bulk run that matches an approved sample visually but not numerically is a run waiting to be rejected.

Sampling and bulk are different activities with different standards of evidence. Sampling produces a piece that a buyer looks at and approves. Bulk produces 100 pcs or more that nobody looks at individually, judged instead by a sample drawn under an AQL plan and measured against a reference. That shift — from visual approval to statistical release — is why handover exists. The sample is the evidence; the eleven items are the argument that makes the evidence apply to the run.

The most common failure is a handover that happens in conversation. A buyer approves by email, the programme team starts bulk, and three weeks later the pre-shipment inspection measures against a reference nobody can produce, with tolerances nobody wrote down. Eleven items in a document takes an hour. It replaces a conversation that will otherwise be reconstructed under pressure at day 28.

The Eleven Items

Eleven items, in the order bulk needs them: the approved reference piece, the programme revision number, gauge and bed, yarn count and lot reference, finished GSM with tolerance, setting parameters, the trim list and jigs, the artwork map, the packing specification, the test reports, and the inspection standard.

  1. Approved reference piece: a physical, measured, stored sample, not a photograph.
  2. Programme revision number: the exact file revision bulk will run, with the superseded one kept retrievable.
  3. Gauge and bed: E7, E12 or E14 and the machine class the programme was written for.
  4. Yarn count and lot reference: count, fibre, recycled content and the specific lot approved.
  5. Finished GSM with tolerance: a number, agreed at plus or minus 5%.
  6. Setting parameters: temperature, dwell and the number of trials behind them.
  7. Trim list and jigs: zip gauge and length, hardware finish, lining, label position, and any retained jig.
  8. Artwork map: the digitised file, the knitted size, the colour count and the placement dimensioned.
  9. Packing specification: units per carton, fold method, marking and the desiccant requirement.
  10. Test reports: each material against each named standard, with the lot they were tested on.
  11. Inspection standard: AQL 2.5 under an ISO 2859-1 sampling plan, and the release authority.

Item by Item: What Each One Prevents

Each of the eleven prevents a specific failure, and the three highest-value items are the setting parameters, the yarn lot reference and the packing count — the three most often left out of a handover and the three most likely to cause a rejection.

Eleven handover items, the failure each prevents, and who signs for it.
ItemWhat it preventsWho signs
Approved reference pieceInspection against a photograph rather than a measured objectBuyer and quality
Programme revision numberBulk running a superseded or an uncorrected fileProgramme team
Gauge and bedA body knitted finer or coarser than the approved pieceProgramme team
Yarn count and lot referenceShade drift beyond Delta E 1.0 and a hand that does not matchProgramme team
Finished GSM with toleranceAn argument about whether 318 g/m² against a 340 target is acceptableBuyer, numbers owner
Setting parametersA body that measures correctly on the day and moves after the first washProgramme team
Trim list and jigsA zip gauge or hardware finish that differs from the approved sampleBuyer and programme team
Artwork mapA logo knitted at the wrong size or in the wrong number of coloursBuyer, design owner
Packing specificationCompression creasing from a carton filled to what fits rather than to weightBuyer, logistics
Test reportsA material cleared for a previous market, not for the current oneBuyer, compliance owner
Inspection standardA release argument at day 28 about how many pieces to checkQuality

The Sample Record: Five Fields That Make Bulk Comparable

A sample becomes comparable to bulk when five fields are recorded against it: gauge, yarn lot, finished GSM, setting parameters and measurement conditions — and without all five, an approval is an opinion rather than a specification.

Measurement conditions are the field most often omitted and the reason two competent people measure the same bag differently. A knitted body keeps relaxing after it leaves the bed, so a piece measured on the knitting day is not the piece that ships. Conditioning for 24 hours at 20 °C and 65% relative humidity is what makes a measurement repeatable, and the standard atmosphere for conditioning and testing is published rather than a matter of preference. Recording the conditions alongside the numbers means a bulk reading can be compared to a sample reading without an argument about which one was taken properly.

Gauge
E7, E12 or E14, and the bed the piece was knitted on
Yarn lot
Count, fibre and the specific lot reference approved
Finished GSM
A number with the agreed tolerance, typically ±5%
Setting parameters
Temperature and dwell, and the number of trials behind them
Measurement conditions
Conditioned 24 hours at 20 °C and 65% relative humidity
Dimensions recorded
Twelve points, to ±3 mm, and handle drop to ±2 mm
Shade reading
Delta E under D65 against the archived swatch, tolerance 1.0
Sample record sheet showing gauge, yarn lot, GSM, setting parameters and measurement conditions beside a folded knitted bag
Five fields against the approved piece: gauge, lot, GSM, setting and conditions — bulk should be compared against this sheet.

What Bulk Needs That Sampling Did Not

Bulk needs four things sampling never required: a yarn booking at the full run quantity, a bed slot with set-up time around it, jigs and packing materials, and an inspection date — and three of the four have to be arranged before day one rather than during the run.

Yarn is the longest pole, at 10 days or more, and on a custom or dope-dyed shade longer again. It is booked at day 1 to 10 of the 30-day window, and the quantity booked is the run quantity plus a reserve, commonly 15%, which covers both knitting waste and the next repeat. The bed slot carries a set-up: about 45 minutes on a repeat and about 1.5 days of programming on a first run, and the programme team needs to know which it is before the slot opens. Jigs and packing materials are ordered against the trim list and the packing specification, so both must be settled at handover. The inspection date is booked alongside the bed rather than arranged after finishing, because inspection capacity is a resource like any other.

  • Yarn booked at run quantity plus about 15% reserve, across days 1 to 10.
  • Bed slot reserved, with set-up time: 45 minutes on a repeat, 1.5 days of programming on a first run.
  • Jigs retained and packing materials ordered against the packing specification.
  • Inspection slot booked for days 24 to 30, not arranged after finishing.
  • Capacity behind the run: 7 production lines at about 200,000 pcs per month.

The Handover Meeting and the Sign-Off Sheet

A handover meeting should run to an hour and end with a sign-off sheet carrying eleven lines and three signatures — because a handover that ends with a verbal agreement has not happened, it has been discussed.

The three signatures correspond to the three decision roles that were named at kickoff: the design decision owner signs for the reference piece and the artwork, the numbers owner signs for gauge, GSM and tolerances, and the compliance owner signs for the test reports and the inspection standard. Where one person holds all three roles, one signature is fine; what matters is that the sheet separates the decisions so that a later question can be traced to the person who made it. The meeting itself should be short and should not re-open the design. Its only job is to confirm that the eleven items exist, that they match the approved piece, and that bulk has what it needs to start on day one.

01

No physical reference

Bulk is measured against a photograph or a memory, and every dimension becomes arguable at inspection.

Most common gap
02

Setting parameters missing

Bulk is set on a guess, and the body measures correctly on the day and moves after the first wash.

Most damaging gap
03

Yarn lot not recorded

A different lot runs, shade drifts past Delta E 1.0, and there is no reference to compare it against.

Most expensive gap
04

Packing count unset

The carton is filled to what fits, pieces compress harder than intended, and creases set during the voyage.

Most visible gap
05

Test report for the wrong market

A carried-over material was cleared for a previous destination, and the current one was never named.

Longest tail
06

Revision number not stated

Bulk runs whatever file is current on the day, which may be the corrected body or the superseded one.

Easiest to fix
Two people at a table signing a handover document with a knitted bag sample and carton specification between them
Eleven lines and three signatures: design, numbers and compliance, each traceable to the person who made the decision.

What the Buyer Should Keep After Handover

After handover the buyer should hold four things: a duplicate reference piece, the sample record, the signed handover sheet and the test reports — because every one of them is needed at inspection, at a reorder, or at a dispute, and none can be reconstructed reliably after the event.

The duplicate reference piece is the one that gets forgotten. A programme team keeps a reference as a matter of routine; a buying team often does not, and then has nothing to compare a delivery against when a question arises three months later. The sample record is the numeric half of the same evidence and should be kept as a document rather than as values inside an email. The signed sheet records who decided what, which matters when a question is about a tolerance rather than a defect. The test reports are needed at reorder, because a new lot has to be shown to meet the same standard, and they are needed at any market or customs enquiry.

  • A duplicate reference piece, stored by the buyer rather than only by the programme team.
  • The sample record as a document: gauge, lot, GSM, setting parameters and measurement conditions.
  • The signed handover sheet, traceable to the person who made each decision.
  • Test reports and chain-of-custody documents, needed again at reorder and at any customs enquiry.
  • The programme revision number, which is what a reorder brief should quote rather than a style name.

Days 1 to 30 After Handover

Bulk runs 30 days from handover: yarn booking across days 1 to 10, knitting across days 8 to 20, finishing and trim across days 18 to 26, and inspection, packing and the pre-shipment release across days 24 to 30.

The overlaps are deliberate and are worth understanding, because they are where a buyer can legitimately ask questions. Knitting starts at day 8 while yarn booking runs to day 10, because the first yarn arrives before the whole lot is complete. Finishing starts at day 18 while knitting runs to day 20, because the first bodies off the bed go straight to trim. Inspection starts at day 24 while finishing runs to day 26, for the same reason. MOQ is 100 pcs per style and per colourway, the release is against AQL 2.5 under an ISO 2859-1 sampling plan, and the term is FOB Xiamen with CIF and DDP available.

The Shortened Handover for a Repeat Run

A repeat run needs five items rather than eleven — revision number, yarn lot, GSM, setting parameters and packing — because the programme, the artwork map, the trim list and the test reports are already archived against the revision.

Repeat-run handover: five items

  • Programme revision number, confirming which archived revision is being repeated
  • Yarn lot, and whether it is drawn from the reserved lot or booked fresh
  • Finished GSM and tolerance, unchanged unless the brief says otherwise
  • Setting parameters, reloaded from the archive rather than re-derived
  • Packing specification, including units per carton and the fold method

With those five, a repeat re-setup takes about 45 minutes and the run completes in 22 days rather than 30. Without them it becomes a development, and the four one-off cost lines come back. For the change discipline that keeps a handover from drifting afterwards, see knitted bag specification change control.

Hand your knit programme over to bulk

Send the approved sample reference, the quantity per colourway and the destination market. Our knit team will return the eleven-item handover sheet with what is still open, and confirm the 30-day plan. Start on the contact page.

Frequently Asked Questions

What is a knitted bag programme handover?

The point at which an approved sample becomes a production specification. It is complete when eleven items are written down, from the approved reference piece and programme revision to the test reports and the inspection standard. The three most often missing are the setting parameters, the yarn lot reference and the packing count.

What are the eleven handover items?

Approved reference piece, programme revision number, gauge and bed, yarn count and lot, finished GSM with tolerance, setting parameters, trim list and jigs, artwork map, packing specification, test reports, and inspection standard. A repeat run needs only five of the eleven, because the rest are archived against the revision.

Why is a physical reference piece necessary?

Because bulk is released statistically rather than visually. A sample drawn under an AQL plan is measured against an object, and a photograph is not an object. Without a stored, measured piece every dimension becomes arguable at inspection. Two reference pieces is the practical answer: one with the programme team and one with the buyer.

What are the five sample record fields?

Gauge, yarn lot reference, finished GSM, setting parameters and measurement conditions. Recorded together they make bulk comparable to the sample instead of merely similar to it. Missing measurement conditions is the reason two competent people read the same bag differently. Twelve dimension points and a shade reading complete the record.

Why does measurement conditioning matter?

A knitted body keeps relaxing after it leaves the bed, so a piece measured on the knitting day is not the piece that ships. Conditioning for 24 hours at 20 °C and 65% relative humidity makes the reading repeatable. The standard atmosphere for conditioning and testing is published rather than a matter of preference.

Who signs the handover sheet?

Three roles named at kickoff: the design decision owner for the reference and artwork, the numbers owner for gauge, GSM and tolerances, and the compliance owner for test reports and inspection. One person may hold all three. The sheet separates the decisions so a later question can be traced to the person who made it.

What is the most damaging handover gap?

Missing setting parameters. Bulk is then stabilised on a guess, and the body measures correctly on the day and moves after the first wash, which is discovered by the customer rather than at inspection. The second most damaging is a yarn lot that was never recorded, which makes shade drift unprovable.

How long is bulk after handover?

Thirty days: yarn booking across days 1 to 10, knitting across days 8 to 20, finishing and trim across days 18 to 26, and inspection, packing and release across days 24 to 30. A repeat run with five items completes in 22 days instead, because programming is removed.

Why do the bulk stages overlap?

Because the first yarn arrives before the whole lot is booked, and the first bodies off the bed go straight to trim. The overlaps are deliberate and are where a buyer can legitimately ask for progress by stage. Knitting starts at day 8 while yarn booking runs to day 10, for exactly that reason.

What does a repeat run need at handover?

Five items rather than eleven: revision number, yarn lot, GSM, setting parameters and packing. The programme, artwork map, trim list and test reports are already archived against the revision. With those five, bed re-setup takes about 45 minutes and the run completes in 22 days.

How long does a repeat take after handover?

Twenty-two days rather than 30, because programming and sampling are removed from the critical path. Bed re-setup takes about 45 minutes when the programme was archived with its record fields. Without them the repeat becomes a development and the four one-off cost lines return. Programming and sampling together are eight days of the first-run critical path.

What if the yarn lot has changed?

Check the new lot against the archived swatch under D65 to the agreed Delta E tolerance of 1.0 before the bed is threaded. If it is outside tolerance, either the lot is rejected or the reference is updated knowingly. Updating the reference knowingly is legitimate; discovering the drift after bulk is not.

People Also Ask

Can bulk start before all eleven items are ready?

It can start on yarn booking while the artwork map and packing are settled, but not on knitting. Anything still open at day 8 tends to become a change request at a point where it costs days rather than hours.

Do I need a new handover for every colourway?

One handover covers the programme; each colourway adds a yarn lot reference and a shade reading. Four colourways mean four lots and four Delta E readings against the same programme revision.

What happens if the approved sample is lost?

The reference has to be reconstructed from the sample record, and an argument follows. Keep two reference pieces: one on file with the programme team and one with the buyer.

Should test reports be re-issued for bulk?

They should be checked against the lot that is running. A report on a previous lot is evidence about that lot, and chain-of-custody documentation travels with the specific material purchased.

How many pieces should be kept as references?

Two per revision: one stored with the programme record and one with the buyer, both measured and photographed. Inspection then has an object rather than a description. Both should be measured and photographed, so inspection has an object rather than a description.

Sources and further reading

Every figure on this page is either our own programme data or attributed below. Open the originals before you write them into a specification.

Handover Is Where Sampling Stops Being a Conversation

Until handover, a knitted bag programme runs on judgement: a buyer looks at a piece and says yes. From handover on, it runs on numbers, because nobody looks at every piece in a run and a sample drawn under an AQL plan has to be measured against something.

The eleven items are the bridge, and they take an hour to write down. For the confidentiality questions that a handover sometimes raises about who holds the file, see knitted bag confidentiality practice. For the programme framework, see custom knit bags.